top of page
Writer's picturemegaplanpm

Predictive and Agile project life cycles






















Predictive and Agile project life cycles are two different approaches to managing and executing projects. Each approach has its own set of characteristics, methodologies, and principles. Here's a comparison of the two:


1. Approach to Planning:



* Predictive (Traditional/Waterfall)**: In the predictive project life cycle, the entire project is planned in detail upfront before any work begins. Requirements are gathered, documented, and signed off by stakeholders. The project progresses through sequential phases (e.g., Requirements, Design, Implementation, Testing, Deployment) with limited opportunities for change once each phase is completed.


* Agile: Agile project life cycle, on the other hand, embraces change and uncertainty. Planning is iterative and incremental, with projects broken down into smaller, manageable time frames called iterations or sprints. Requirements are captured in the form of user stories and prioritized based on business value. Teams continuously adapt to changing requirements and feedback throughout the project.


2. Flexibility and Adaptability:



* Predictive: The predictive life cycle is less adaptable to changes once the project has started. Scope changes are often discouraged or require formal change management processes, which may lead to delays and additional costs.


* Agile: Agile is highly flexible and encourages change. The project team continuously collaborates with stakeholders to adjust priorities and adapt to emerging requirements, making it easier to respond to changing needs and market dynamics.


3. Feedback and Iteration:


* Predictive: Feedback and testing usually occur towards the end of each phase. If any issues or changes are identified during testing, it may require revisiting previous phases to make modifications.


* Agile: Agile embraces freque


nt feedback and iteration. At the end of each iteration/sprint, a potentially shippable product increment is delivered. This enables stakeholders to provide feedback early and often, allowing the team to incorporate changes and improvements quickly.



* Delivery and Timeframe:


* Predictive: Projects are typically executed in a linear fashion, and the entire project is planned to be delivered at the end within a specific timeframe.


* Agile: Agile projects are delivered incrementally and iteratively. Working software is delivered in small pieces at the end of each sprint or iteration, providing value to stakeholders early and continuously.


* Risk Management:


* Predictive : Risk management i


s often focused on identifying and mitigating risks during the planning phase. Changes to requirements or external factors can introduce new risks.


* Agile


: Agile incorporates risk management throughout the project life cycle. The iterative approach allows for continuous risk identification and mitigation. Risks are addressed collaboratively by the team in regular meetings.


In summary, the main difference between predictive and Agile project life cycles lies in their approach to planning, flexibility, feedback, and adaptability to change. Predictive approaches are more suitable for projects with well-defined and stable requirements, while Agile is well-suited for projects in dynamic and uncertain environments that require frequent adaptations and continuous stakeholder involvement.

61 views0 comments

Comments


bottom of page